Project consisted of 1600 feet of concrete taxiway; 6500 feet of asphalt roadway and 12.5 acres of concrete apron. Land-Mark was responsible for construction survey, including slope stakes, blue tops and controlling the concrete forms. An “As-Built” survey was performed on an 18 feet grid throughout the concrete taxiway and concrete apron. Electronic files were submitted in Microstation format.

Categories: Projects Comments Off on Ammo-Hot Load Area, Fort Bliss, Texas
Share this blog here:
Copyright © 2016 Land-Mark Professional Surveying, Inc. All rights reserved.
Privacy Policy

Email Us

Your message was successfully sent. Thank You!